1) Adopt a conceptual vision of the future and master facilities plan
School has changed, and our facilities should reflect evolving teaching and learning needs. The last decade (2010-present) is the longest timespan without major school construction or renovation in Batavia since 1955.
These needs start with students and recognizing the varied pathways our students will take when they graduate. Whichever path our students choose, we need to:
- Increase student agency and ownership in the learning process, and
- Build-in project work cycles where students learn, create, iterate to solve problems for a variety of audiences.
1a) Embracing the Core Team’s guiding principles and belief statements. In exploring the current conditions and needs for Building Our Future Together, the Core Team developed the following guiding principles:
- Our schools and sites are safe, secure and comfortable for all users.
- Our school facilities meet District standards for learning spaces.
- Our schools inspire pride and reflect the history of the community.
- Learning opportunities and experiences are available to and accessible for all students.
- Spaces are to be flexible and adaptable for students and staff.
- Learning spaces embrace and support differing student paths.
- Our programs and spaces foster innovation and empower students.
- Our school facilities provide spaces that enhance partnerships and engagement with our community.
- Our school facilities support the social and emotional well-being of students and staff.
- Collaboration for all stakeholders is necessary for learning and growing.
- Our facilities support extra- and co-curricular opportunities and promote authentic learning experiences.
- Improvements to our facilities consider long-term sustainable operations and environmental impact.
In addition, the Core Team identified “must-have” items and spaces:
- Safe and Secure entrances and spaces within the building.
- Physically accessible spaces that also address varied learning styles and different learning paths.
- Spaces that are flexible and adaptable for all building users.
- Equitable access to learning opportunities, experiences, programs, and physical spaces.
- Clean, healthy, and sustainable spaces.
The Core Team also identified aspects that stakeholders do not want changed:
- Single high school structure
- Single middle school structure
- Grade level configuration (pre-Kindergarten/K-5, 6-8, 9-12)
- Character of each school community in order to provide equity, safety and flexibility
- Neighborhood school structure
- Innovative programs
1b) Continuing to operate six elementary schools. Student enrollment has declined by 15% over the last decade and projections estimate that will likely fall by 2% annually for the next five years or more. Accordingly, the Core Team considered closing one or more of our six elementary schools. Preliminary analyses do not indicate significant operational cost savings, if at all, primarily due to offsetting student transportation costs. Further, potential impacts on home values and neighborhoods are uncertain and not likely positive.
Instead, the Core Team relied upon the input received from the community survey, which indicates a strong preference for maintaining all six neighborhood elementary schools.
1c) Replacing the four oldest elementary schools. The current facility conditions of Alice Gustafson Elementary (1957), H.C. Storm Elementary (1978), J.B. Nelson Elementary (1955) and Louise White Elementary (1978) indicate that it would be more cost-effective to replace, rather than renovate, these facilities.
The cost of outstanding repairs, ongoing maintenance on schools and improvements to meet the current teaching and learning needs are so extensive that rebuilding is more economical. Community feedback supported the school rebuilding option (52%), while approximately 34% disagreed, and 14% were neutral.
1d) Renovating the four remaining schools. The remaining schools, Batavia High School (1967), Rotolo Middle School (1992), Grace McWayne School (2001), and Hoover-Wood School (2001) require significant updates and renovations to align with the proposed vision and improve learning conditions.
2) Live within its taxpayers’ means
The majority of funding for BPS101 schools comes from the local community through property taxes, which is consistent with our neighboring communities. Ideally, facility updates would be completed without increasing the existing bond and interest tax levy.
2a) Increasing annual allocations for capital projects. For the last five years, the Board has allocated $1.5 to 2 million annually (1.5 to 1.7% of expenditures) to capital projects for safety compliance, maintenance of current assets or equipment, and improvements that enhance facilities, infrastructure, or programs.
The National Council on School Facilities recommends investing 4% of a facilities’ current replacement value annually on periodic renewals, alternations, and maintenance, which implies that the Board should consider at least doubling its current annual allocation.
2b) Seeking a community referendum within current debt repayment structures. The scale of the work identified significantly exceeds the Board’s financial capacity. Since the Board’s current outstanding bond debt will be paid off in 2026, it should consider a community referendum for new debt to support the master facilities plan without increasing the tax burden.
2c) Leveraging fund balance and other revenue sources. The Board has considerably improved its financial health in recent years, moving from ISBE’s “financial watch” list to “recognition.” Also, due to the pandemic, budget surpluses in 2020 and 2021 (projected) were greater than anticipated. While current fund balances are not inordinate, one-time contributions toward facilities may be prudent if they do not jeopardize cash flow.
The Board will also receive more than $2 million for coronavirus relief from the federal government. While such monies may not be directly eligible for capital projects, they may temporarily relieve other funding needs.
3) Establish a long-term and proactive approach to facility maintenance and improvements
The Board should ensure that adequate funding for maintenance and improvement of facilities is integral to all budgetary and strategic planning, including monitoring and performance metrics.
3a) Balancing and coordinating financial capacity with priorities. An in-depth implementation plan is necessary to coordinate project details, cost estimates, priorities, timelines, and feasibility. Community feedback indicates strong preference for addressing high priorities soon or now (71%).
3b) Protect our investments, now and in the future. The Board has committed additional funds in recent years to address the growing list of deferred maintenance needs. Community feedback supportis addressing deferred maintenance (90%) which suggests that the District should take a proactive approach so that facilities are maintained in “good” or “fair” condition in the future.
3c) Seeking guidance from community engagement professionals. Among the 1,100 community survey respondents, most have students in school and some groups are underrepresented. Although the majority of respondents indicated support for replacing facilities in poor condition rather than renovating (57%, with 14% neutral and 30% opposed), more community discussion around this topic is warranted. A comprehensive engagement strategy around referendum planning is needed, and the Board should consider hiring professionals with this expertise.